FANDOM



Shaft Sector Work Report is a file in Dino Crisis 3.

LocationEdit


TranscriptEdit

Work Log #: 000C4C
Date/Time: April 13, 2245, 8:00 am
Location: Main Shaft Central Elevator
Problem: Elevator is operating abnormally.
Diagnosis: Power apparatus breakdown due to capacity overload.



Action Taken: Replaced apparatus. In addition, an alternative means of access has been scheduled for construction.



Work Log #: 000C4D
Date/Time: May 14, 2245, 8:00 am
Location: Upper Main Shaft Ventilation Fan
Problem: Ventilation fan failure.
Diagnosis: Emergency shutdown due to excess oxygen supply.



Action Taken: Checked oxygen-supply program. Installed manual shutdown and an anti-grav platform to facilitate future inspections.



Work Log #: 000C4E
Date/Time: July 1, 2246, 5:00 am
Location: Upper Main Shaft Control Room
Problem: Fire from terminal burnout.
Diagnosis: Energy distribution error.



Action Taken: Accessed Panel Room via fan. Used platform installed in the previous year. Evacuated personnel and extinguished fire.



Work Log #: 000C4F
Date/Time: May 3, 2247, 2:00 am
Location: Lower Main Shaft Crew Quarters
Problem: Fire caused by a terminal short.
Diagnosis: Extensive and continuous use of personal terminal.



Action Taken: Fire contained by the room's auto maintenance system.



Work Log #: 000C4G
Date/Time: November 3, 2247, 2:00 am
Location: All Shaft Sector compartments
Problem: Power supply and gravity control malfunctions due to energy-supply problem.
Diagnosis: Violent disturbance in Energy Core.



Action Taken: Kept area clear until the core was safely reactivated. No casualties.

The original Japanese transcript for this file is not yet present. Please add it.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.